Basic Info.
After-sales Service
Online Video
Type
Volumetric Filling Machine
Filling Principle
Gravity
Packaging Container Lifting Structure
Function
Washing Filling Capping
Machine Material
Stainless Steel 304/316
Transport Package
Export Standard Packages
Origin
Zhangjiagang, Jiangsu, China
Product Description
Sparkling juice aerated beverages soda filling machine
FeaturesMain components of the equipment:The main unit of the equipment composes of bottom plate frame, glass frame, bottle washing machine, bottling machine, capping machine, main motor drive, star-wheel drive, star-wheel plate, cap arranging mechanism, lower cap tank, cap separating mechanism and electric control system.Glass frame is used for closing the surrounding environment of the main unit, the upper part applies transparent glass door for monitoring the equipment, glass door is installed with protective device which can automatically stop the machine if it is activated. The entire machine features beautiful appearance, safe and reliable working. Ventilation mechanismCap elevatorThere are sensors in side of cap sorting device of three in one machine, if quantity of caps is enough in the cap sorting device, the cap elevator will stop transfer caps, while if the quantity of caps is shortage in the cap sorting device, the cap elevator will start transfer caps from the bottom cap hopper.Washing: The rotary wheel is a fully SUS304 stainless steel welded structure of thickness not less than 12 - 15 mm.
The machine will applies overturning bottle clamp, and this bottle clamp grips bottle at neck position, avoiding bottle mouth thread contamination caused by rubber gripper block of a traditional bottle clamp. Made of SUS304 stainless steel, the bottle clamp should be hygienic and durable.
The atomizing spray nozzle should be high efficiency and installed on bottle clamp to be capable of cleaning any part of bottle inner wall, and also saves rinsing water.
The rinser is driven by driving system positioned inside machine frame via gear transmission.
Filler:Rotary wheel fully made of stainless steel SUS 304.
Filling valves are made of SUS304L.
Filling valves are reasonably structured with accurate filling.
Bottles go up and down in the function of cam through elevator, to process filling with contact to bottle-mouth.
Level of cylinder is controlled with float-ball.
Filler is driven through gears inside the machine frame.
Link-wheels in rinser, filler and capper are transported in ringed support of bottle-neck.Capping: Capping mechanism
Capping mechanism composes of cap separating mechanism, capping machine and cap arranging mechanism.
The machine is designed on the base of Alcoa (France) technology. It adopts magnetic moment capping, which has the function of unload the overloading force on the cap, so the capping head have the function of protect the cap from damage. If the neck size and cap of your bottle is the same, you do not need to change any part
Technical parameters
Model | DCGF18186 | DCGF24248 | DCGF323210 | DCGF404012 | DCGF505012 |
Head of washing, filling, sealing | 18-18-6 | 24-24-8 | 32-32-10 | 40-40-12 | 50-50-12 |
Capacity (b/h) | 4000-6000 | 6000-7000 | 8000-10000 | 12000-15000 | 15000-18000 |
Suitable bottle diameter(mm) | Φ=50-100 H=150-310 330-1500ml | Φ=50-100 H=150-310 330-1500ml | Φ=50-100 H=150-310 330-1500ml | Φ=50-100 H=150-310 330-1500ml | Φ=50-100 H=150-310 330-1500ml |
Filling precision | ≤±5mm | ≤±5mm | ≤±5mm | ≤±5mm | ≤±5mm |
Motor power | 3.84kw | 4.1kw | 5.6kw | 7.5kw | 11kw |
Filling pressure | ≤0.4 | ≤0.4 | ≤0.4 | ≤0.4 | ≤0.4 |
Overall dimension (mm) | 2600×1900×2550 | 3100×2200×2800 | 3850×3000×2850 | 4850×3800×2750 | 5750×3550×2750 |
Weight(Kg) | 3650 | 4800 | 6800 | 8650 | 10500 |
Service Term1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days excluding travel days. The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.
2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.Commercial Terms
1. Warranty
All parts are under One Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.
2. Payment
30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sightCompany Information:ZHANGJIAGANG BEYOND MACHINERY CO., LTD. is a group company located in Sanxing Industrial Park, Zhangjiagang City, Jiangsu Province, China.For beverage machine, our main products including: *The capacity of 2000-- 30000 BPH for juice and tea hot filling producing line. *The capacity of 2000 -- 30000 BPH for mineral water and purified water producing line. *The capacity of 2000 -- 30000 BPH for carbonated beverage and cold filling producing line. *The capacity of 1000 - 8000 BPH for vinegar and alcohol and oil producing line. *The capacity of 100 -- 2000 BPH for 1 and 3 and 5 gallon barrel producing line. *The capacity of 2000 -- 10000 BPH for soybean milk and peanut milk and other plants protein drink producing line. *2~20T/H water treatment equipment(mineral water and pure water). *PET perform inject and blowing-stretching machine. Relevant equipments: Bottle unscrambler/Full bottle overturn sterilizer/Concentrating equipment/Plate and tube UHT device/CIP system/Labeling machine/Auto film shrinking packing machine. We carry a strict quality management system in accordance with ISO9001 requirements. We have established a complete processing line including design and manufacture and sale and after sale service. Our products are well sold around the world. We are proud to adhere to our company slogan "Engineering Excellence". Please be free to contact us for more information and we are ready for making business relations with you in the near future.Warm Prompt
Beyond Machinery supports processing customization and provides a complete set of beverage
water production equipment. The property specifications and quotations of all products are for
reference only. The price marked is not the actual transaction price. Due to different product
models and specifications, the product price is subject to the contract agreed by both parties. Our
company follows the principle of winning by quality and in the principle of being responsible to
customers. You can communicate with our staff before buying, thank you!
FAQ:
Q:What are you main products?
A:Zhangjiagang Beyond Machinery Co., Ltd. is a 12-year-old manufacturer specializing in the production of beverage filling machinery and equipment. We have been certificated by the famous cercification authority.
The products include: beverage filling machiner,hot filling production line, Pure water filling machine, pure water production equipment, oil filling machine; beer can(bottle) filling machine;milk filling production line, 5 gallon filling production line , carbonated soft drink production line , big bottle water filling production line , three-in-one filling machine, beverage equipment, etc.
Similiar equipments contain water treatment plant ,PET bottle blowing machine,bottle unscramber machine,labeling machine,packing machine,sterilizer,date printer,etc.
We can help you to start a new company in beverage production line .we make all of our customers be satisfied with the machine and our service.Any question about this machine or our factory ,please contact us ,sincerely serve for you .
Q:How can I install my machine when it arrives?
A:We will send the engineers to install and test the machines and have training lessons abroad, but the Visa fee, round tickets, accommodation, eating, and the allowance of 80USD per day per person will be on customer's side.
Or the customer can send the engineer to our company to complete the inspection of the goods, as well as the installation and training lessons ,but the Visa fee, round tickets, accommodation, eating, and the allowance will be paid by customers .
Q:What's your guarantee or the warranty of the quality if we buy your machines?
A:We offer you high quality machines with 2 years guarantee . we will give u free spare parts in 2 years.
If during the warranty period, the quality or specification of the goods is found to be inconsistent with the contractual requirements, or if the goods are found to be defective (including potential defects or the use of unqualified materials, etc.), the buyer has the right to use the inspection documents issued by the statutory authority. During the warranty period of the goods, the buyer shall make a claim against the seller.
Q:Where is your company located ?How can i visit there?
A:Our factory is located in XiGang jinfeng town,zhangjiagang City,Jiangsu Province,China.
You can fly to Shanghai Pudong International Airport and we are warmly welcome to visit us.(Provide pick-up service.)
Q:How can l get some samples?
A:We have no sample.we will send you more pictures and video about this machine,and welcome to visit our factory to see the machine running in the factory.
Q:How about the quality of your products.
A:Our company guarantees that the products provided are brand new, unused, with the latest design and suitable materials, and comply with the quality, specification and performance of the contract in all respects.
Q:What's the delivery time?
A:7-45 days after the T/T deposit or L/C.(The premise is to receive customer's samples and deposit).
Q:What about Product's material and configuration use?
A:304 stainless steel, the machine frame material is iron. According to customer requirements, 316 stainless steel is available , complete machine stainless steel, and customers demand specified configuration.
OUR SERVICE:
We are proud to adhere to our company slogan "Engineering Excellence".Quality of products is the life of Beyond, customers' satisfaction is our emphasis of work. Repeat orders from old customers are our standard to measure the user's experience.
Warranty: 12 months
Warranty for motors: 12 months
In the warranty period:
In order to provide customers improve and thoughtful service, eliminating the customer's worries. Our company has established a perfect after-sales service system and effective after-sales service measures, and through a dedicated hotline after-sales service to provide users with satisfactory answers to questions and technical support; and has a service department to conduct regular customer visits. The company currently has more than 10 professional service engineers as a strong after-sales service team, ask your service to provide protection. Our company to you to make subordinate repair service commitment, and in accordance with the requirements of the service commitment to provide you with maintenance services.
Whole-hearted service every day!