Gold Member Since 2015
Audited Supplier
Zhangjiagang Beyond Technology Co., Ltd.

Packing Machine, Carbonated Water Fillling, Liquid Filling Machine manufacturer / supplier in China, offering Carbonated Alcohol Beverage Filling and Capping Machine (DCGF40-40-12), Factory Direct Sale 20 Liter Barreled Water Filling Machine, 5 Gallon Water Filling Equipment Plant and so on.

(/ )

Supplier Homepage Product Filling machine for Carbonated Drink Carbonated Alcohol Beverage Filling and Capping Machine (DCGF40-40-12)

Carbonated Alcohol Beverage Filling and Capping Machine (DCGF40-40-12)

FOB Price: US $10,000-30,000 / Piece
Min. Order: 1 Piece
Min. Order FOB Price
1 Piece US $10,000-30,000/ Piece
Get Latest Price
Port: Zhangjiagang, China
Production Capacity: 20sets Per Month
Payment Terms: L/C, T/T

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: DCGF40-40-12
  • Automatic Grade: Fully Automatic
  • Filling Valve Head: Multi-Head
  • Dosing Device: Capacity Cup
  • Packaging Container Lifting Structure: Pneumatic Lifting
  • Packaging: Bottle
  • Control: PLC Siemens
  • Certificate: Ce SGS
  • Warranty: 2 Years
  • Transport Package: International Standard Export Package
  • Origin: Zhangjiagang, Jiangsu, China
  • Type: Volumetric Filling Machine
  • Material Type: Liquid
  • Feed Cylinder Structure: Single-Room Feeding
  • Filling Principle: Gravity
  • Structure: Rotary
  • Packaging Material: Wooden Case
  • Material: S.S 304 or SUS316
  • Quality: High
  • Trademark: BEYOND
  • Specification: CE SGS
  • HS Code: 8422301090
Product Description
Carbonated Alcohol Beverage Filling And Capping Machine (DCGF40-40-12)


The Soda Water/Cola Filling Machine/Automatic Production Line is mainly used in the beverage filling operations.

THE FLOW CHART


FEATURES:

1. The product line is mainly used in washing, filling and sealing carbonated beverage such as carbonated drinks, cola, iced tea and carbonated mineral water and so on.

2. The construction is advanced. The performance is stable. The operation and maintain are easy. And the speed can be adjusted infinitively and accords with the standards. It is an ideal choice for small and middle scale drink factories.

3. All the line is composed by rotary washer, balanced pressure filler, screw type sealer and conveying sysytem. The capcity is from 3000b/h to 40000b/h
 

Model
DCGF
16126
DCGF
18186
DCGF
24248
DCGF
32328
DCGF
404010
DCGF
484812
DCGF
606015
DCGF
808020
Heads of washing, filling, sealing16-12-618-18-624-24-832-32-840-40-1048-48-1260-60-1580-80-20
Production capacity(bottle/hour)3000-40005000-
7000
8000-1200012000-1500016000-1800020000-2400024000-2800036000-40000
Suitable bottle heightH=170-320Φ=50-100
(330-1500ml)
      
Spraying pressure0.25-0.3
Total Power1.5+0.372.2+0.373+0.45+
0.25
5.57.5111519
Overall dimension(L×W×H)
 
2300×
1680×
2650
2500×
1760×
2650
3100×
2100×
2650
3800×
2800×
2650
4000×
3300×
3400
4850×
3650×
3300
6500×
5400×
3500
7650×
6400×
2700
Weight26003500465068008500100001250016000
 


Service Term
1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
 
While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days  . The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
 
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges  air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.
 
2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.

Commercial Terms
1. Warranty
All parts are under two Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.
 
2. Payment
30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sight

Connection:
 
Phone:+86 18921971286
Tel: +86-512-55398012
Fax: +86-512-55398012
Address: XiGang jinfeng town,
Zhangjiagang city, jiangsu province
Send your message to this supplier
Avatar
Ms. Joanna Lu
Sales Manager
*From:
To: Ms. Joanna Lu
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now