Gold Member Since 2015
Audited Supplier
Zhangjiagang Beyond Technology Co., Ltd.

Water Equipment, Packing Machine, Liquid Filling Machine manufacturer / supplier in China, offering Automatic Heads Bottle Mineral Water Filling Machine, Factory Direct Sale 20 Liter Barreled Water Filling Machine, 5 Gallon Water Filling Equipment Plant and so on.

(/ )

Supplier Homepage Product Filling machine for Water Automatic Heads Bottle Mineral Water Filling Machine

Automatic Heads Bottle Mineral Water Filling Machine

FOB Price: US $10,000-30,000 / Piece
Min. Order: 1 Piece
Min. Order FOB Price
1 Piece US $10,000-30,000/ Piece
Get Latest Price
Port: Zhangjiagang, China
Production Capacity: 20sets Per Month
Payment Terms: L/C, T/T

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: CGF18-18-6
  • Automatic Grade: Automatic
  • Filling Valve Head: Multi-Head
  • Dosing Device: Capacity Cup
  • Packaging Container Lifting Structure: Pneumatic Lifting
  • Packaging: Bottle
  • Power: by Order
  • Material: S.S 304 or 316
  • Capacity: 10000bph for 500ml
  • Transport Package: International Standard Export Package
  • Origin: Zhangjiagang, Jiangsu, China
  • Type: Volumetric Filling Machine
  • Material Type: Liquid
  • Feed Cylinder Structure: Single-Room Feeding
  • Filling Principle: Gravity
  • Structure: Rotary
  • Packaging Material: Wooden Case
  • Control: PLC
  • Certificate: CE
  • Trademark: Beyond
  • Specification: CE; SGS
  • HS Code: 8422301090
Product Description
Automatic Heads Bottle Mineral Water Filling Machine



Feature:
1. The machine is mainly used in the beverage filling operations. Suitable for non-carbonated drink filling machine, The three functions of bottle wash, fill and seal are composed in one body of the machine.
2. The whole process is automatic. The machine is used in filling juices, mineral water and purified water in bottles made of polyester and plastics.
3. The machine can also be used in hot filling if it is installed with temperature controlling device. The handle of the machine can be freely and conveniently turned to adjust the machine to fill various types of bottles.
4. The filling operation is faster and more stable because the micro pressure filling operation of the new type is adopted.
5. The advanced OMRON programmed controller (PLC) is adopted to control the machine to run automatically while a transducer is used in the bottle -entering chains to adjust speeds and coordinated with the transducer of the main machine to make the operations of moving bottle forward steadily and reliably.
6. It is convenient to operate with higher automation because every part of the machine is inspected to run with photo electricity, On the bases, the filling parts of the machine can be changed into filling methods of lower vacuum. The filling category of lower vacuum (Z type machine) is applicable in glass bottles, filling alcohol, soy and such like materials. The aluminum theft proof cap and plastic cap can be adopted.

Model: CGF24-24-8
Capacity: 10000bph(base on 0.5L bottle)
Filling precision: <5mm (surface location)
PET bottle Specifications:
Bottle neck 20-40,
Bottles height: 130-340mm,
Bottle diameter: 50-110mm;
Apply to the screw-shaped plastic caps(26-35mm)
Bottle washing pressure: 0.18Mpa
Water consumption: 1500kg/h
Air Source pressure: Atmospheric pressure
Air Consumption: 0.3cbm
Total power: 5.27kw
Total weight: 4000kg
Overall dimension: 2865× 2170× 2350


THE DETAILS OF THE MACHINE
Our BEYOND Water filling machine/Beverage filling machine(CGF24-24-8) is your best choise. 
 Model:CGF16/12/6CGF18/18/6CGF24/24/8CGF32/32/12CGF40/40/12CGF48/48/12
Production Capacity:500ml(B/h)4000600010000140001700020000
Suitable Bottle Standard:(mm)150-300150-340150-340150-340150-340150-340
Suitable Cap Standard:(mm)φ50-φ110
Filling Pressure:(Mpa)0.2-0.3
Installed Capacity:(L)3.133.843.845.66.37.3
Filling Temperature:Room TemperatureRoom TemperatureRoom TemperatureRoom TemperatureRoom TemperatureRoom Temperature
Overall Size:L×W×H(mm)2400×1670
×2350
2470×1970
×2350
2865×2170
×2350
3700×2570
×2350
3800×2950
×2400
4500×3400
×2400
Total Weight:(kg)25003000400050006000 


Our Company

Service Term
1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days excluding travel days. The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges  air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.

2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.

Commercial Terms
1. Warranty
All parts are under Two Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.

2. Payment
30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sight



Connection:
 
Phone:+86 18921971286
Tel: +86-512-55398012
Fax: +86-512-55398012
Address: XiGang jinfeng town,
Zhangjiagang city, jiangsu province
 
Send your message to this supplier
Avatar
Ms. Joanna Lu
Sales Manager
*From:
To: Ms. Joanna Lu
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now