Gold Member Since 2015
Audited Supplier
Zhangjiagang Beyond Technology Co., Ltd.

Bottled Water Machine, Drinking Water Machine, Bottle Filling Machine manufacturer / supplier in China, offering Turkey Solution for Mineral Water Plant Filling Machine, Automatic Pet Bottle Blowing Machinery with Nice Price, Automatic Concentrated Fruit Juice Filling Produce Plant with Ce Certificate and so on.

(/ )

Supplier Homepage Product Filling machine for Water Turkey Solution for Mineral Water Plant Filling Machine

Turkey Solution for Mineral Water Plant Filling Machine

FOB Price: US $8,000-13,000 / Piece
Min. Order: 1 Piece
Min. Order FOB Price
1 Piece US $8,000-13,000/ Piece
Get Latest Price
Port: Zhangjiagang, China
Production Capacity: 200 Sets/Year
Payment Terms: L/C, T/T

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: CGF
  • Automatic Grade: Automatic
  • Filling Valve Head: Multi-Head
  • Dosing Device: Capacity Cup
  • Packaging Container Lifting Structure: Pneumatic Lifting
  • Packaging: Bottle
  • Function: Washing Filling Capping
  • Machine Material: Stainless Steel 304/316
  • Trademark: BEYOND
  • Specification: CE/SGS
  • HS Code: 8421219990
  • Type: Volumetric Filling Machine
  • Material Type: Liquid
  • Feed Cylinder Structure: Single-Room Feeding
  • Filling Principle: Gravity
  • Structure: Rotary
  • Packaging Material: Plastic
  • Control: PLC
  • Capacity: 2000b/H-20000b/H
  • Transport Package: Export Standard Packages
  • Origin: Zhangjiagang, Jiangsu, China
Product Description
High quality Small Manufacture Bottled Mineral Water Machine
 
Turkey Solution for Mineral Water Plant Filling Machine

Description:
This CGF Wash-filling-capping 3-in-1unit: Beverage Machinery is used to produce polyester bottled mineral water, purified water, alcoholic beverage machinery and other non-gas beverage machinery. The CGF Wash-filling-capping 3-in-1unit: Beverage Machinery can finish all the process such as press bottle, filling and sealing, it can reduce the materials and Outsiders touch time, improve the sanitary conditions, production capacity and economic efficiency.

Pure water mineral water bottling machine washing part:
The rotary wheel is a fully SUS304 stainless steel welded structure. 
The machine applies unique overturning bottle clamp. This bottle clamp grips bottle at neck position, avoiding bottle mouth thread contamination caused by rubber gripper block of a traditional bottle clamp. Made of SUS304 stainless steel, this bottle clamp is hygienic and durable. 
The high efficiency atomizing spay nozzle installed on bottle clamp is capable of cleaning any part of bottle inner wall, and also saves rinsing water. 
All sliding bushes of lifting device use Igus (Germany) anti-corrosion maintenance free bearing. 
The rinser is driven by driving system positioned inside machine frame via gear transmission. 
Transfer Starwheel 
Made of stainless steel of superior quality. 
Equipped with bottle jam protection device. 

Pure water mineral water bottling machine filling part:
Rotary wheel fully made of stainless steel SUS 304. 
Gravity filling method. 
Filling valves are made of SUS316L. 
Filling valves are reasonably structured with accurate filling. 
Filling flow can reach 200ml per second. 
Bottles go up and down in the function of cam through elevator, to process filling with contact to bottle-mouth. 
Level of cylinder is controlled with float-ball. 
Filler is driven through gears inside the machine frame. 
Link-wheels in rinser, filler and capper are transported in ringed support of bottle-neck 

Pure water mineral water bottling machine capping part:

Cap distributing chute is equipped with reverse cap stop and reverse cap pick-out mechanism. 
Cap distributing chute is equipped with a photocell switch to stop the capper when there is no cap inside the chute. 
The capper is equipped with inlet bottle detection switch. 
Centrifugal way of cap arranging is adopted to reduce damage of caps. 
A cap inspecting system is applied to control on-off of elevator. 

Turkey Solution for Mineral Water Plant Filling Machine
 

Model
CGF16126CGF18186CGF24248CGF32328CGF404010
Heads of washing, filling , sealing16-12-618-18-624-24-832-32-1040-40-12
Production capacity (bottle/hour)2000-40005000-70008000-1200012000-1500016000-20000
Suitable bottle diameter(mm)φ=50-100 H=170 330-1500ml
Spraying pressure2~3
Motor powerMain 
motor 1.5kw
Main motor2.2kwMain motor3kwMain motor4kwMain motor7.5kw
Power of outer vacuum pump0.751.11.52.22.2
overall dimension (LxWxH)2100x1400x25002460x1720x26503100x2100x26503500x2500x26504600x1800x2650
Weight25003500420055006800



Service Term
1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
 
While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days excluding travel days. The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
 
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges  air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.
 
2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.


Commercial Terms
1. Warranty
All parts are under One Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.
 
2. Payment
30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sight

Turkey Solution for Mineral Water Plant Filling Machine
Connection:
 
Phone:+86 18921971286
Tel: +86-512-55398012
Fax: +86-512-55398012
Address: sanxing Industry park,
Zhangjiagang city, jiangsu province
Send your message to this supplier
Avatar
Ms. Joanna Lu
Sales Manager
*From:
To: Ms. Joanna Lu
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now