Gold Member Since 2015
Audited Supplier
Zhangjiagang Beyond Technology Co., Ltd.

5 Gallon Water Machine, Gallon Bottle Filling Line, Bottle Filling Machinery manufacturer / supplier in China, offering 5 Gallon Water Bottling Processing Equipment Machine, Factory Direct Sale 20 Liter Barreled Water Filling Machine, 5 Gallon Water Filling Equipment Plant and so on.

(/ )

Supplier Homepage Product Filling machine for 3&5Gallon 5 Gallon Water Bottling Processing Equipment Machine

5 Gallon Water Bottling Processing Equipment Machine

FOB Price: US $8,000-9,000 / Piece
Min. Order: 1 Piece
Min. Order FOB Price
1 Piece US $8,000-9,000/ Piece
Get Latest Price
Port: Zhangjiagang, China
Production Capacity: 20sets Per Month
Payment Terms: L/C, T/T

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: QGF300
  • Automatic Grade: Fully Automatic
  • Filling Valve Head: 2
  • Dosing Device: Capacity Cup
  • Packaging Container Lifting Structure: Pneumatic Lifting
  • Packaging: Barrel
  • Material: S.S 304
  • Trademark: Beyond
  • Specification: CE; SGS
  • HS Code: 8422301090
  • Type: Volumetric Filling Machine
  • Material Type: Liquid
  • Feed Cylinder Structure: Single-Room Feeding
  • Filling Principle: Atmospheric Pressure
  • Structure: Linear
  • Packaging Material: Wooden Case
  • Control: PLC Siemens
  • Transport Package: International Standard Export Package
  • Origin: Zhangjiagang, Jiangsu, China
Product Description
5 Gallon Water Bottling Processing Equipment Machine 

 
QGF Series barrel machine is specially used for3&5 Gallon barrel drinking water.  It is the good ideals for produce the mineral water/distilled water/pure water equipmes.

5 Gallon Water Bottling Processing Equipment Machine

Features:
1. The machine combines the functions of rinsing, filling and capping.
2. Whole body of the machine is made of stainless steel with anti-corruption and easy-rinsing.

3. The main electrical parts are from Siemens and Omron.

4. Pneumatic parts are imported.

5. Rinsing nozzles adopt American spraying system technology.

6. With compact structure, high efficiency and stable operation, this is a highly automatic unit with machine, electricity and pneumatics in one machine.

following is the date and flow chart
 

Model
QGF-80QGF-150QGF-300QGF-450 QGF-600QGF-900QGF-1200
Filling volume3 (Gallon),5 (Gallon)
Capacity801503004506009001200
Barrel size(mm) Ø230×420    Ø276×490
 

5 Gallon Water Bottling Processing Equipment Machine

Service Term
1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days excluding travel days. The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges  air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.

2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.

Commercial Terms
1. Warranty
All parts are under Two Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.

2. Payment
30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sight

5 Gallon Water Bottling Processing Equipment Machine 
 

Connection Information:
Address: Sanxing Industry Park,
Zhangjiagang City, Jiangsu Province
Phone:+86 13962462093
Fax: +86-512-55398012
Send your message to this supplier
Avatar
Ms. Joanna Lu
Sales Manager
*From:
To: Ms. Joanna Lu
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now